| The picture above was taken at the time of delivery to site of a panel construction type analyzer house. The materials of construction was 3CR12which was powder coated The Analyser house was fitted with four Siemens Infra-red Analysers. The sample conditioning on the side of the house was heated with steam to ensure the process sample were kept in the vapour phase. The analyzer house was installed in a Zone II area classification and supplied with a split level air-conditioning system as well as a forced ventilation system. |
The picture above was taken of a Panel construction type shelter. The materials of construction was 3CR12 powder coated. The sample conditioning system inside the wire cage was for conditioning of high purity ethanol.
The analyzer shelter was fitted with a Process gas chromatograph to perform the analyses. The Analyser house was supplied and fitted with a split level air-conditioning system as well as a forced ventilation system and was suitable for use in a Zone II area classification. |